Nine steps from brief to handover.
01 / 09Pre-concept
Brief intake, site reading, programme distillation. We identify what is fixed, what is open, and where the largest design moves can land.
02 / 09Concept Design
Spatial concept, mood, materiality. A single direction is set — supported by reference imagery and a written rationale.
03 / 09Schematic Design
Plans, sections and key elevations resolved at scale. Major millwork, ceiling and lighting strategies fixed.
04 / 09Detail Design
Construction-grade drawings, material specs, finishes schedule, joinery and FF&E packages.
05 / 09Tender Documentation
Issued-for-tender package: bills of quantities, scope splits and technical clarifications ready for pricing.
06 / 09Tender Management
Contractor shortlist, RFI cycles, value engineering and award. We sit on the client side of the table throughout.
07 / 09Construction Support
Site visits, shop drawing review, issue resolution. We keep the design intent intact through the build.
08 / 09Guideline Package
A maintainable handover dossier — finishes, lighting scenes, operating notes — so the space stays as designed.
09 / 09Post-completion Review
Six- and twelve-month visits. We measure how the space is being used and feed the findings back into the next project.